Production audit
We provide factory production control (FPC):
-
Reviewing factory control documentation, reviewing the Initial Type Testing (ITT) protocol, examining ordering procedures and volumes, applying the CE marking, and having a declaration of conformity.
-
Assessment of procurement processes and control of incoming materials — (structural steels, steel castings, welding consumables, mechanical fasteners), production preparation, and order fulfillment processes.
-
Close control of the welding plan. Personnel qualification assessment: certification of welders, welding coordinators, and non-destructive testing specialists.
-
Control of surface preparation for anti-corrosion protection and painting. Control of production and measuring equipment (list, identification, frequency of maintenance).

Monitoring compliance with technical requirements
• processing of workpieces of parts;
• assembly of metal structures;
• preheating (if necessary);
• temporary connections;
• execution of welded seams;
• heat treatment after welding;
• verification and testing;
• identification and traceability of processes;
• records of operations performed;
• execution of executive documentation.
Contact us if you want to improve your production processes or need answers to technical questions.
